Projects


TUNNEL FOR SAWAGE COLLECTOR AIRPORT SOFIA


 


Year: 2000

Role of Georh Engineering in the project: 

Tunneling through the NATM (New Austrian Tunneling Method) tunnel, 8 2 (mining cross section