CONSTRUCTION OF SECOND TUBE OF THE TUNNEL AT KM 327 ROAD E-79


 


Year: 2002-2008

Role of Georh Engineering in the project:

Geotechnical engineering designs; Feasibility and other Technical Studies; Final Design;

Monitoring and documentation of the construction works

Tunneling through the NATM (New Austrian Tunneling Method) , 86 ì2 (mining cross section), slope stabilization and slope support