Year: 2002-2008
Role of Georh Engineering in the project:
Geotechnical engineering designs; Feasibility and other Technical Studies; Final Design;
Monitoring and documentation of the construction works
Tunneling through the NATM (New Austrian Tunneling Method) , 86 ì2 (mining cross section), slope stabilization and slope support