Projects


III-5004, Section: ‛Gabrovo Shipka - Kazanlak‛


 


Year: 2009

Role of Georh Engineering in the project:

Feasibility and Final Design of:

- Road tunnel SHIPKA   R= 5.30; L= 3200

- 5 nos road tunnels    R = 5,15; total length 860m

- Road tunnel    R= 6,65;  L= 171